Building Materials Hauling

Veteran-Owned ★ Real Trucking Experience

Building Materials: load secured on the trailer

What we haul

Building Materials done right

A late delivery means a crew standing around. We plan pickups around your schedule and call ahead before we roll onto site.

  • Lumber & Trussesframing lumber, trusses and engineered wood, tarped and dry
  • Steel & Rebarbeams, rebar and structural steel, chained to spec
  • Block, Pipe & Roofingpalletized and bundled materials for residential and commercial builds
  • Job-Site Deliverydelivery windows planned around your crew, with a call before arrival

Securement

Your materials arrive the way they left

Lumber, block and steel get edge protection wherever a strap crosses a corner, and the strap count goes by length, not by guesswork.

How securement works

24-ft steel beams · 12,000 lb · nothing blocking the front 1234 first 10 ft: 2next 10 ft: +1+4 ft: +1 4tie-downs min.

How Your Load Is Handled

  1. 01

    Quote

    Tell us the load, pickup and delivery. You get a straight price and honest times.

  2. 02

    Pickup

    We arrive in the window we promised, with the right trailer and gear.

  3. 03

    Securement

    Chained, strapped and tarped to spec, then checked again on the road.

  4. 04

    Delivery call

    We call before we roll onto your site, and again when it's delivered.

Note on current operations

Our own trucks are parked while we finalize insurance. We still hold active DOT and MC authority, we dispatch owner-operators every day, and we welcome inquiries for upcoming loads and partnerships.

Get a quote

Tell us about your building materials load

What, from where, to where and when. We'll come back with a straight answer, usually the same day.

Our own trucks are parked while we finalize insurance. We still hold active DOT and MC authority, we dispatch owner-operators every day, and we welcome inquiries for upcoming loads and partnerships.

Or call 434-394-0605

Building Materials Questions

Can you deliver straight to a job site?

Yes. Tell us about access, unloading equipment on site and the delivery window, and we'll plan for it.

Do you tarp lumber?

Yes, lumber and materials that need to stay dry are tarped.

Are you hauling right now?

Our own trucks are parked while we finalize insurance. We still hold active DOT and MC authority, we dispatch owner-operators every day, and we welcome inquiries for upcoming loads and partnerships.

Do you also dispatch owner-operators?

Yes. If you run your own truck, see truck dispatch: a flat $250 a week plus 2% of gross.

Need building materials in Virginia?

Tell us what, where and when. Owner-operators, ask about dispatch at $250 a week + 2%.